Two numbers, same card, same moment:
100% and 0.76%
One of these numbers represents what you are charged for, while the other represents what you should be charged for.
The first number is GPU utilization, which is the figure displayed on your dashboard. The second number is SM Active, indicating the actual portion of the chip that was in use. Both numbers were obtained from an H100 on 9 September 2026, at the same moment.
Which one of the two do you think the bill follows? Hold that question in mind. I come back to it at the end.
I rented an H100 to verify my hypothesis
In July, I wrote a talk description stating: the bill arrives, three times higher than expected, and no one can explain the discrepancy. In September, I rented a card to see if I could justify that statement.
I rented it three times, for approximately four hours, at a cost of $18.71 plus German VAT. This was the most affordable part of the entire project. The invoice accurately records the duration of my rental, but it has no knowledge of how I utilized the card. Keep that receipt in mind.
Prior to renting the H100, I conducted a simple test on the gaming GPU in my own PC: running one thread on a single core out of 36. The gauge indicated that it was 100% busy. That moment confirmed that I had a talk worth giving.
Let me introduce you to Nadia. She manages GPUs that someone else pays for and has done everything correctly: benchmarked the model, sized the fleet accordingly, and her dashboard has consistently shown utilization of 90% or higher. She is not careless; she represents us.
A GPU can be thought of as a truck that is rented on an hourly basis. The term "busy" refers to the truck being in use, or on the road, and it never means the truck is full. When benchmarks are run, the trucks are utilized to their full capacity. In production, the trucks are not run full. As a result, the fleet of trucks needs to be tripled in size, prompting the person responsible for finances to inquire: you previously stated that the trucks were 90% busy, so why have we just purchased three times the number of trucks we already had?
There are three lies that stand between that dashboard and this question.
Lie #1 — the metric
What exactly does GPU utilization measure? NVIDIA has provided the answer for us:
Percent of time over the past sample period during which one or more kernels was executing on the GPU.
That's the documentation for nvidia-smi, which describes the NVML field (nvmlUtilization_t.gpu) that DCGM exports under the name DCGM_FI_DEV_GPU_UTIL. The time between samples ranges from one second to a sixth of a second, depending on the specific product.
One. Or more.
The H100 features 132 SMs, 80 GB of memory, and a very wide bus. Having one thread active on a single SM will show 100% utilization, and the same result is seen when the entire chip is fully utilized. This metric doesn't measure the extent of utilization; it's simply a yes or no inquiry that NVIDIA performs several times per second.
So I misled it by running one thread on 1 out of 132 SMs — which is less than one percent of the chip's capacity:
| GPU_UTIL | SM Active | Tensor | MFU | tok/s | |
|---|---|---|---|---|---|
| spin loop | 100% | 0.76% | ~0 | ~0 | 0 |
0.76% is precisely equivalent to 1/132. The dashboard provides measurements on the road. Everyone interprets it as full.
Fine, run something serious
That's a fair objection. A spinning thread is merely a toy. So, I'm using a 7B model on vLLM, handling one request at a time, on the same rented card. I say to it "Hi".
| GPU_UTIL | SM Active | Tensor | DRAM | MFU | tok/s | |
|---|---|---|---|---|---|---|
| batch 1 | 90% | 54.59% | 1.62% | 62.3% | 0.23% | 148 |
The GPU utilization is at 90%, with only 0.23% of its capacity being used for actual work.
This is because, in order to generate a single word, the chip must access the entire 15 GB model. This process is repeated for every word, and it's equivalent to taking a full trip to the loading dock for just one envelope.
Performing two operations per weight across 7.62 billion weights results in 15.2 GFLOP per token, which translates to approximately 15 microseconds of mathematical computation. However, reading 15.2 GB of weights at a rate of 2.2 TB/s takes 6.8 milliseconds. The math units are only busy for 0.015 ms out of the total 6.8 ms. This accounts for the 0.23% of the GPU's capacity being utilized for actual computations. An H100 requires around 295 operations per byte read to become compute-bound, and batch-1 decode uses each byte exactly once.
This limitation is rooted in physics, rather than inefficient coding. The fix isn't a bigger GPU, but rather optimizing the process to handle more envelopes per trip.
Batch 64
| GPU_UTIL | SM Active | Tensor | DRAM | MFU | tok/s | |
|---|---|---|---|---|---|---|
| batch 1 | 90% | 54.59% | 1.62% | 62.3% | 0.23% | 148 |
| batch 64 | 85% | 62.07% | 11.18% | 57.4% | 11.6% | 7,485 |
From 148 to 7,485 tokens per second, the workload is fifty times greater.
The lie-number actually decreased, dropping from 89% to 85%.
The trip and fuel remained the same, with sixty-four envelopes. The MFU shifted from 0.23% to 11.6%, which is a desirable number for inference, as the literature suggests a healthy inference workload falls within the 5–15% range, representative of a fully loaded truck, unlike most dashboards that describe an empty one.
SM Active only increases from 54.59% to 62.07% as the workload rises fifty times. Even the second-most honest metric is nearly oblivious to batching. DCGM's own documentation says why:
Note that "active" does not necessarily mean a warp is actively computing. For instance, warps waiting on memory requests are considered active.
SM Active catches the spin loop. For inference, you need to measure Tensor Core activity and MFU.
The fields that don't lie
These fields are included with DCGM, but you won't find them on the standard display. Consider a kitchen in a restaurant:
-
DCGM_FI_PROF_SM_ACTIVE— are cooks present at their workstations? -
DCGM_FI_PROF_SM_OCCUPANCY— what's the workload for each cook in terms of concurrent tasks? -
DCGM_FI_PROF_PIPE_TENSOR_ACTIVE— is the specialized cooking equipment in use? -
DCGM_FI_PROF_DRAM_ACTIVE— how frequently are cooks accessing the pantry? - MFU — the ratio of actual meals served to the kitchen's theoretical hourly capacity.
Position these next to the misleading information:
# dcgm-counters.csv
# --- The lie ---
DCGM_FI_DEV_GPU_UTIL, gauge, GPU utilization (in %) — fraction of time at least one kernel was running.
# --- The truth (Datacenter Profiling fields; need --cap-add SYS_ADMIN and a datacenter GPU) ---
DCGM_FI_PROF_SM_ACTIVE, gauge, Ratio of cycles an SM has at least 1 warp assigned.
DCGM_FI_PROF_SM_OCCUPANCY, gauge, Ratio of number of warps resident on an SM.
DCGM_FI_PROF_PIPE_TENSOR_ACTIVE, gauge, Ratio of cycles the tensor (HMMA) pipe is active.
DCGM_FI_PROF_DRAM_ACTIVE, gauge, Ratio of cycles the device memory interface is active.
MFU is the metric that equates to financial cost: the actual work performed, divided by the theoretical work the GPU could perform within the same hour.
The rule. If GPU utilization exceeds 80%:
- SM Active is below 10% → no work is being executed.
- SM Active is high, but MFU is under 5% → a process is running, however it is not performing computations.
In terms of business: financial losses are being incurred.
Lie #2 — the scheduler
NVIDIA is not the only one in this situation. Kubernetes has also provided its response on the "Schedule GPUs" page:
Containers (and Pods) do not share GPUs. There's no overcommitting of GPUs. Each container can request one or more GPUs. It is not possible to request a fraction of a GPU.
The two sentences about sharing were later dropped from the page. The behaviour remained unchanged.
resources:
limits:
nvidia.com/gpu: 1 # integer. request == limit. no fractions. no overcommit.
A whole number. A pod that requires 1% of a card takes the card.
Observe the process. pod-a runs one spinning thread and gets the GPU. pod-b is an exact duplicate and requests one:
pod-a Running
pod-b Pending 0/1 nodes are available: Insufficient nvidia.com/gpu
The node indicates that nvidia.com/gpu 1/1 is allocated. The card is utilized at 1% busy.
It is 99% unutilized and 100% unavailable. One envelope has booked the entire truck.
Kubernetes did not misallocate the card's resources; it blocked the card instead. The fix involves setting one configuration flag:
# device-plugin time-slicing config
version: v1
flags:
migStrategy: none
sharing:
timeSlicing:
renameByDefault: false
failRequestsGreaterThanOne: false
resources:
- name: nvidia.com/gpu
replicas: 4
The README for the device plugin explains precisely what it does:
The NVIDIA device plugin allows oversubscription of GPUs through a set of extended options in its configuration file. […] If this configuration were applied to a node with 8 GPUs on it, the plugin would now advertise 80
nvidia.com/gpuresources to Kubernetes instead of 8.
The node is now advertising nvidia.com/gpu: 4. The status of pod-b changes from Pending to Running in about ten seconds. The card and pod are the same, with no other changes made.
Three honest ways to share a card
Time-slicing. Workloads alternate. There is no isolation - one workload can cause delays for the others, and there is nothing to prevent this. This method is suitable for development and bursty work.
MPS. Multiple workloads share one context. Since there are no barriers, a single problematic tenant can affect all others. This option should not be oversold.
MIG. Actual barriers are implemented in hardware. This method is rigid, requiring the node to be drained to re-partition, and it is limited to A100/H100-class only. On the card I rented, it was divided into seven slices, and the node advertised them:
nvidia.com/mig-1g.10gb: 7
All three options require explicit enrollment. The standard configuration is one pod and one card.
The direction of this development is as follows: DRA became generally available in Kubernetes 1.34, while partitionable devices and consumable capacity remain in beta, and NVIDIA contributed its DRA driver to CNCF at KubeCon EU 2026, indicating the path forward, although not for the current quarter.
In commercial terms, by default, you are buying it twice. Kubernetes is concerned with the number of trucks, without examining their contents.
Lie #3 — the bill
This particular statement is factual, which poses a problem.
Recall the invoice? My longest test lasted 2 hours 30 minutes, utilizing one H100, and cost $11.01, which translates to $4.41 per hour.
Cloud billing calculations are based on the duration and cost. There is no provision for accounting for actual usage.
Consider the batch-1 hour. The dashboard reported 90% GPU utilization. However, the genuine metric for the same hour was 0.23% MFU.
$4.41 per hour
= $0.01 that did work
+ $4.40 that bought idle silicon (99.8%)
One H100 operating continuously costs approximately $3,200 per month. For batch 1, this translates to $7 spent on actual work and $3,193 spent on unused processing power. This is what the extra GPUs would buy. Now, multiply this by the number of cards you have.
Here is the detailed version of the billed hour, recorded from 15:45–16:45 UTC, which includes half of batch 1 and half of batch 64.
"the_lie": { "gpu_util_pct_avg": 86.2 },
"the_truth": { "sm_active_pct_avg": 57.9, "tensor_active_pct_avg": 6.8, "mfu_pct": 5.89 },
"the_bill": { "cost_usd": 4.42, "cost_that_did_work_usd": 0.26,
"cost_of_idle_silicon_usd": 4.16, "idle_pct": 94.1,
"tokens_generated": 13791321, "usd_per_1m_tokens": 0.32 }
86% is displayed on the dashboard. The MFU is 5.89%. Of that hour, $0.26 was spent on actual work and $4.16 was spent on idle silicon. I conducted this measurement twice, using two separate droplets, and obtained 5.9% both times.
You might argue that I'm not configuring them correctly, or that your workload is unique and you have a better understanding of how to optimize resources.
Maybe. However, consider Cast AI's report, which covers the period from January 2025 to April 2026 and encompasses approximately 23,000 Kubernetes clusters. The average GPU utilization is 5%.
This figure is based on the dashboard number, and the actual values are even lower.
Which metric does the bill follow?
Neither of them.
The bill is based on hours, not work. It provides an honest but useless measure, as it only indicates what was spent without revealing what was achieved.
In business terms, it is impossible to prove that any of the expenses were justified.
Why does this issue persist in 2026?
The metric is not flawed; it is simply answering a question from 2007.
At that time, a GPU could only run one task at a time, and determining whether it was busy was the only relevant consideration. However, as the chip evolved to 132 cores, the question was never updated.
Kubernetes counts entire units as a single entity for a similar reason: the fact that GPUs lack a native operating system. CPUs have had sixty years of development in schedulers, preemption, and isolation, while GPUs have only had a driver. Time-sharing was introduced in 1961, but hardware partitioning on a GPU was not available until 2020. Time-slicing, MPS, and MIG are essentially the missing OS, arriving late to the scene.
While the CPU has spent fifty years evolving, the GPU has been primarily focused on gaming.
What to do on Monday
Plot MFU alongside GPU utilization on the same dashboard, on the same panel if you can. The instant the two lines diverge, you will have a specific value to take action on.
Scale on queue depth, never on utilization. The utilization level is 90% regardless of whether the truck is full or empty, which means autoscaling based on this metric will either result in perpetual scaling or none at all. Using KEDA with vllm:num_requests_waiting adds a truck only when there are actually envelopes waiting, ensuring that the trucks you are already paying for are utilized to their full capacity first. If autoscaling is not an option, cap and batch instead. In a continuous batching setup, a queue represents the truck filling up, rather than a failure. The added latency cost per token is minimal — ranging from 6.8 ms to 8.6 ms when increasing the batch size from 1 to 64.
Stop relying on the default scheduler settings. Choose time-slicing, MPS, or MIG based on the actual isolation requirements.
Price inference per million tokens, not per GPU-hour, and present this number to the person responsible for signing the checks. For the same silicon and hour, my calculation is:
| $ per million tokens | |
|---|---|
| batch 1 | $8.28 |
| batch 64 | $0.16 |
The price is fifty times higher. The silicon is the same. The gauge remains unchanged.
Or, as it goes in German: Zeit ist Geld, aber das Finanzamt will trotzdem beides.
The last thing
The dashboard never lied to you with the intention of hurting you, and neither did the benchmark. They both provided honest answers to their respective questions — is the GPU busy? and what can this chip do when it's full? However, neither of these questions was what I was actually paying for, which was is the GPU doing my work?
Utilization does not equate to work.
GPUs are in the process of evolving to meet our current demands, but this development has only just begun. The immature aspect is not the silicon itself, but rather the software that surrounds it. Additionally, these cards consume a significant amount of power, resulting in wasted resources beyond just financial costs.
If you get it right, you will receive a 98% discount. If you get it wrong, you will incur costs that are 50× higher, and you will also have a negative impact on the environment as an added consequence.
You must measure the question that you are actually paying for.
Top comments (1)
The invoice arrives, the dashboard says 90% busy, and finance asks why the fleet just tripled: that meeting is the one your Nadia story is really about
The 100% against 0.76% gap is the entire problem, the bill follows hours rented while the metric only says a kernel was running, so a fleet sized on a benchmark gets bought three times over once production traffic doesn't fill it, and at H100 rates across a real fleet that's a six figure yearly line nobody can trace to one decision, plus the workloads that sat waiting because capacity looked full when it wasn't
Under our standard setup the fleet is sized on SM Active from the start, a card that drops under threshold is flagged the day it happens and the excess goes back to spot or gets torn down without a ticket, so the dashboard number never drives the purchase
Curious what your sizing was based on before the H100 test, was it the dashboard number