A short case study from an FPGA limit order book prototype. All numbers are post-route estimates from Yosys + nextpnr on a Lattice ECP5 (LFE5U-85F), not vendor sign-off.
The trap: Fmax is a proxy, not a goal
I kept optimizing for Fmax because that was the number in my acceptance criteria. Then I computed the actual latency:
| Version | Stages | Fmax | Latency | Throughput |
|---|---|---|---|---|
| Single-stage | 1 | 95.65 MHz | 10.45 ns | 95.7 M/s |
| Two-stage | 2 | 154.58 MHz | 12.94 ns | 77.3 M/s |
| Three-stage | 3 | 155.86 MHz | 19.25 ns | 51.9 M/s |
Frequency went up 62%. Latency and throughput both got worse.
The reason is simple arithmetic: latency = stages x period. Splitting the logic shortened the critical path by 1.6x, but the cycle count doubled. 2 / 154.58 MHz = 12.94 ns, which is worse than 1 / 95.65 MHz = 10.45 ns.
Placement seeds varied by only a few MHz (95.82 / 91.75 / 93.43), so this is logic depth, not placement luck.
What I would do instead
Split only if every stage shrinks by more than the stage count grows. Otherwise you are trading latency for a number that does not matter.
The three-stage version was especially instructive: after splitting the 16-bit adder into two 8-bit halves, the critical path report showed 3.1 ns of logic and 3.3 ns of routing. On this device the bottleneck had moved from logic to wires.
Second finding: O(log N) is not free
To reach 1,024 price levels I tried an occupancy bitmap with priority encoding.
| Version | Fmax | LUT4 |
|---|---|---|
| Linear scan (64-way + 16-way chains) | 66.49 MHz | 4,490 |
| Tree (4-4-4) | 81.45 MHz | 4,510 |
Only 22% faster. The critical path moved to the wide mux that selects one word out of 64, not the scan itself.
Third finding: an asynchronous read kills BRAM inference
Moving the 1,024 x 16 quantity array to block RAM looked obvious. It did not work:
wire cur_q = bid_q[cmd_level]; // asynchronous read for read-modify-write
Because the read has to be combinational, synthesis could not infer BRAM. The array became 32,768 flip-flops plus write decoders and read muxes: 102k LUT4, 122% of the device, and place-and-route did not finish in 20 minutes.
The fix is architectural: split command processing into S1 (issue the memory read), S2 (compute), S3 (write back). That is the pipeline the spec asked for from the beginning.
What this project is (and is not)
It is a level-indexed price ladder with best bid/ask, a Python reference model, invariants in the testbench, and a mutation-testing script. 30 mutants, 100% score after fixing two real gaps in the tests.
It is not a trading system: no per-order FIFO, no queue position, no feed parsing.
The verification part was more interesting than the RTL. Two mutants survived during development, and both pointed at holes in the tests, not the design:
- Removing the
cmd_validgate changed nothing, because the testbench had never issued an idle cycle. - An 8-bit truncation on the ask side survived, because the ask side had never been tested with large quantities.
Mutation testing is the only technique I have found that measures whether tests have teeth.
Links
- Repository: https://github.com/chang-chinjung/fpga-order-book
- Longer write-up: https://github.com/chang-chinjung/fpga-order-book/blob/main/docs/ARTICLE_EN.md
If you have done timing closure on small ECP5 designs and disagree with the routing numbers, I would like to hear it.