DEV Community

News
News

Posted on Edited on

Kioxia and NVIDIA show SSD flash as GPU memory extension: 1.1 PB capacity PoC on a GB200 NVL72 rack

Infographic cover

๐Ÿ“… November 28, 2026 โ€ข Kioxia / NVIDIA

Kioxia and NVIDIA have shown a proof of concept in which SSD flash acts as an extension of effective GPU memory rather than as a separate storage tier. Announced in the United States on November 25 and in Japan and the APAC region on November 26, the demonstration runs on the NVIDIA SCADA library (Scaled Accelerated Data Access) within the NVIDIA Storage-Next initiative. The stated goal is petabytes of effective memory for GPU systems, with trade coverage continuing on November 27 and November 28.

The test rig is a GB200 NVL72 rack with 18 server nodes and 144 KIOXIA XD8 Series 7.68 TB E1.S NVMe SSDs, giving roughly 1.1 PB of raw flash capacity. With 8 SSDs per node, each server carries close to 60 TB of flash extension next to its GPU memory. The 1.1 PB figure describes the raw capacity of the rack, not memory placed on the GPU itself.

SCADA extends effective GPU memory onto NVMe SSDs and adds small-block granular access, handling data in 512-byte blocks. The software architecture is potentially designed for 2 trillion 512-byte vectors. That figure is a stated capacity potential rather than a measured result. Target workloads are large-scale vector databases and graph neural networks, where the working set of embeddings and graph structures grows faster than HBM can hold.

The motive is capacity pressure. As AI datasets grow, workloads that fit only in HBM end up splitting data and shuttling it between memory and storage on every step, and the storage path becomes the bottleneck. A flash tier keeps a much larger dataset reachable for the GPU without extending HBM itself. Jason Hardy, VP of Storage Technology at NVIDIA, frames the shift in agent terms: the intelligence of AI agents increasingly depends on the knowledge they can reach, not only on the compute they run on.

The caveats are as important as the result. Latency, throughput and power consumption have not been published, 2 trillion vectors remain a stated capacity potential rather than an observed scale, and no commercialization timeline has been announced. Both companies continue to evaluate technical feasibility and performance, so this reads as a capacity PoC rather than a shipping product. For automation teams the logic is straightforward: the approach answers the capacity question before the performance question.

Sources:
apac.kioxia.com/en-apac/business/news/2026/20261126-1.html
americas.kioxia.com/en-us/business/news/2026/ssd-20261125-1.html
techspot.com/news/114716-kioxia-nvidia-demo-144-ssds-expand-gpu-memory.html
trendforce.com/news/2026/11/27/news-kioxia-nvidia-begin-1-1-pb-ssd-based-gpu-memory-expansion-tests-to-address-hbm-capacity-limits/
eetasia.com/kioxia-nvidia-demonstrate-ssd-based-extension-of-gpu-memory-for-ai-workloads/

Key figures

IMPACT checklist


Continue the conversation: https://t.me/AIAutomationArchitecture ยท Bluesky

AI Automation

Top comments (0)