DEV Community

Dollar Dhingra
Dollar Dhingra

Posted on • Originally published at dollardhingra.com on

Bus Factor in Software Engineering

1. Introduction

Imagine that John Doe works on a project along with 7-10 folks. John started working on this project from the beginning and therefore knows a lot more than everyone else in the project.

These leads to some problems such as:

  1. John is the go-to person for each detail that the team needs. John has a lot of responsibility and workload on his shoulders, making his progress sometimes slow.
  2. Whenever John falls sick and goes on unplanned leave, he is bugged by his team to keep things moving forward in the project.
  3. The organisation finds it hard to replace John and has therefore retained him twice in the past year by raising his compensation twice.

In short, the project has a single point of failure -> John Doe

2. What is Bus Factor?

As per Wikipedia, The bus factor is a measurement of the risk resulting from information and capabilities not being shared among team members, derived from the phrase β€œin case they get hit by a bus”. It is also known as the bread truck scenario, bus problem, beer truck scenario, lottery factor, truck factor, bus/truck number, or lorry factor.

In simple words, what is the probability of the project failing if John Doe gets hit by a bus and is not able to return to work?

Higher the bus factor higher the risk of failure.

3. Reducing/Preventing the Bus Factor in Software Development

3.1 Documenting

Creating and maintaining documentation can take a good amount of effort from all the stakeholders. But in the long run, it is worth documenting. Documenting includes Product Requirement Documents(PRDs), High & Low-level design documents, changelogs, READMEs, complete ticket descriptions on ticketing tools, Root Cause Analysis documents in case of production fires, etc

3.2 Code Reviews

If done effectively, code reviews can act as an excellent tool to reduce the bus factor, given that everyone in the team gets a chance to review the code. The Engineering manager/team lead should make sure that there are relative code review guidelines set up as per the team so that it is effective enough.

3.3 Meetings

Yes, I know meetings sometimes slow us down and hinder our productivity. Also, some meetings can just be replaced by an email. But, meetings (especially if you are working remotely) can actively reduce the bus factor if done correctly. Meetings like standup, sprint planning/grooming, design discussions, sprint retros etc bring everyone together as a team. Imagine you reading a minute of meeting document vs actually brainstorming in the meeting. Meetings do not replace the documentation. Instead, the documentation complements the meeting process.

3.4 Team Process

More team processes can improve the knowledge distribution in the team like:

  • Pair programming
  • Office hours
  • On-call rotations
  • Engineering demos
  • Knowledge sharing sessions

3.5 Positive Work culture

A positive culture means employees are happy in the organisation and a better work environment is created. Following techniques can be applied to improve the work culture and reduce the bus factor:

3.5.1 Mandatory Paid Annual Vacation

Most of the organisations provide paid leave to their employees. The organisations should also encourage people to use these leaves and go on a vacation(for a week at least). This will enable other employees to take care of work in the absence of an employee.

3.5.2 Short Notice/Termination Period

A short notice period means, the organisation making sure that there is less dependency on an employee.

Conclusion

The first step is to talk about Bus factor in your team, even if you are a junior member in the team. Maybe, some of the above methods like meetings, code reviews, documenting etc. are already being used in your organisation for sharing knowledge. You can consider optimising those methods to reduce/prevent the bus factor in your team. For eg, you can consider including the junior members of your team in meetings and code reviews. The members with a centralized knowledge can work on spreading their knowledge in the team so that they can spend their time and energy on something new for the team.

What do you think of Bus factor in your team? Do you have more methods to prevent high bus factor? Feel free to give your feedback!

Top comments (1)

Collapse
 
prondubuisi profile image
Onyemenam Ndubuisi

Great insights and suggestions on reducing the bus factor.