I unpacked the Snow Removal Business Starter Kit's 17 files and re-derived every number from the files themselves. Six quotes check to the cent. The headline route-efficiency figure does not survive contact with the kit's own time table.
The problem: the pricing question nobody answers with arithmetic
If you type "how much should I charge for snow removal" into a search engine, you get a lot of people telling you to "know your numbers." You get very little showing you the numbers.
That is not a small gap. A snow-removal business is decided by arithmetic that happens in a narrow window: October through March, in the dark, at 11 PM, with a forecast that changes. Two operators with the same truck, the same storm and the same street can end up $14,000 apart over a season because one of them stacked a holiday surcharge onto the salt line and the other did not, or because one of them quoted a lot from a photograph instead of a measurement.
The specific questions that decide the first season:
- What do you charge for a two-car driveway versus a 25,000-square-foot commercial lot?
- How do a deep-snow uplift, an after-hours uplift and a holiday uplift combine — do they add, do they multiply, and does any of them touch the salt?
- What does the property manager sign before you touch their lot at 11 PM?
- How do you survive a July with zero snow income?
- And the one nobody wants to answer honestly: how many minutes does each stop actually take, and what does that do to your revenue per hour?
That last one turns out to be the interesting one. More on it below.
The product
The Snow Removal Business Starter Kit is a $1 bundle of plain files: a rate card, a lot-size tier table, a quote template with a nine-line formula, six worked quotes, a startup cost breakdown, three contract templates plus a client intake form, a storm-event SOP, a safety checklist, a licensing and insurance primer, two sales/acquisition documents, a route and rebooking playbook, a seven-day launch plan, a seasonal cash-flow planner, and a Python script that checks the math.
No accounts. No software. No plugins. Seventeen files at the archive root, 41,920 bytes, 13,737 words of prose across eleven Markdown documents, four CSVs, a licence and a verifier.
Snow Removal Business Starter Kit — Pricing Calculator & Operations Docs — listed at $1.00 USD at the time of writing.
Disclosure: I write marketing and distribution copy for the agency that publishes this kit, which is how I came to open it in the first place. I was paid for that work, not for this article, and nothing below is a testimonial — every figure is one you can reproduce from the ZIP with a spreadsheet and ten minutes. I have not changed the listing, the price, or any file inside the kit.
What I actually did
I extracted the archive, wrote my own nine-line engine in Python using Decimal arithmetic (not the shipped self_qos.py — I wanted an independent reimplementation), and re-derived:
- all six worked quotes from the rate card, cell by cell;
- the startup cost totals three ways;
- the route-density table from the kit's own per-tier on-site time standards;
- the seasonal rate card against the per-push rate card;
- the material pass-through prices against the stock costs the same kit buys at.
Then I mutated copies of the kit seven ways to see what its verifier actually catches.
Here is the short version: the quote math is real, and the route-efficiency number is not what the kit says it is.
What checks out (and I want to be specific about this)
The nine-line formula, in the kit's own fixed order:
base = round2(lookup(Service Code + Tier Code) * Qty)
service = round2(base * (1 + 0.20 * depth_flag))
adjusted = round2(service * (1 + 0.25 * after_hours + 0.15 * holiday))
salt = round2(salt_bags * 7.50)
subtotal = round2(adjusted + salt)
discount = round2(0.10 * base * seasonal_commit)
travel = round2(max(0, miles - 15) * 1.75)
total = round2(subtotal - discount + travel)
contract = round2(total * planned_visits)
I recomputed all six rows in 04_Worked_Quotes.csv from 01_Rate_Card.csv with that formula. All 132 numeric cells re-derived exactly — zero mismatches, not one cent of drift. The three headline examples are correct as printed: $65.00 (two-car driveway, two salt bags), $163.00 (small lot on a holiday, eight bags, 18 miles) and $371.75 (medium lot, deep snow plus after-hours plus holiday, twelve bags, 32 miles).
The order rules also hold up under a deliberate attempt to break them. Deep snow multiplies the base only. After-hours and holiday compose additively on the service line — 1 + 0.25 + 0.15 = × 1.40 — and never touch the salt. The seasonal discount comes off the original base, not the storm-inflated one. Travel is last, free to 15 miles then $1.75. I checked each of these by recomputing the case where the rule would visibly break, and the sheet matches the rule.
The startup table sums honestly three ways: $7,445 → $23,350 all rows, $6,395 → $20,650 on the plow path, $3,945 → $11,850 on the walk path. Those are the numbers the README prints, and they are the numbers the CSV produces.
The contracts are real documents, not stubs. The per-push agreement carries a trigger-depth clause, a salt pass-through clause, a 14-day quote validity window and an initialled liability paragraph. The seasonal contract makes you read a sentence admitting that a quiet winter does not reduce the agreed rate. The sidewalk agreement hedges municipal deadlines rather than pretending to meet them. All three say "business documents, not legal advice, have a professional review them" — and mean it, because the licence file and the licensing primer both disclaim it again.
The safety file has 50 tick-boxes across the kit (40 of them in the compliance checklist, 10 in the storm SOP) and covers hypothermia, frostbite, carbon monoxide, backing, ice beneath snow, fatigue and hi-vis. Nothing exotic, nothing wrong.
The finding: the route grid contradicts the kit's own time standards
File 11 opens with a five-stop worked storm night, Table RD, dated 2026-12-09. It prints each stop's revenue, leg miles, leg drive minutes and on-site minutes, then derives:
Revenue: 432.50
Route minutes: 144 (= 2.40 h)
Revenue per hour: 180.21
Revenue per stop: 86.50
Drive share: 18.75%
Then, four lines later, the kit sets its own hurdle: "Target 150.00 per hour or better before fuel."
$180.21 clears $150 comfortably. That is the number a new operator will remember.
But file 02 — the lot size tier table, three files earlier in the same bundle — publishes an on-site time standard for every tier. Let me put them side by side.
| Stop | Tier | On-site minutes printed | Standard in file 02 | Delta |
|---|---|---|---|---|
| RT-01 | DRIVE-2C (2-car driveway) | 15 | 22 | −7 |
| RT-02 | DRIVE-1C (1-car driveway) | 12 | 15 | −3 |
| RT-03 | DRIVE-3C (duplex pad, deep snow) | 20 | 30 | −10 |
| RT-04 | LOT-S (small commercial lot) | 45 | 45 | 0 |
| RT-05 | SIDEWALK-100 ×3 sections | 25 | 36 | −11 |
Only the commercial lot meets its own standard. The other four stops run faster than the tier table says the same work takes — by 31 minutes in total.
Recompute the same $432.50 route at the kit's own standards: 148 minutes on site plus the 27 printed drive minutes is 175 route minutes, 2.92 hours, $148.29 per hour.
That is below the kit's own $150 hurdle. On its own numbers, the worked example that teaches you to aim for route density does not clear the target it sets.
I want to be careful about what this does and does not prove. It does not prove the example is dishonest — a fast operator beats a standard, and the standards are planning figures, not stopwatches. What it proves is narrower and more useful: the headline $180.21/hour is not reproducible from the kit's own time table. The printed figure is 21.5% above what the same route earns at the standards printed three files earlier. If you plan a season on $180.21 and your crews work to file 02, you will plan a fifth more revenue per hour than the route can deliver — and the route takes 31 minutes longer than the table assumes.
Fix it either way. Raise the on-site minutes in Table RD to the standards and re-derive ($148.29), or lower the standards in file 02 to match what the table assumes. Doing neither leaves a buyer holding two numbers that disagree by a fifth and no instruction about which one is real.
Five more things the bundle's verifier will not tell you
The kit ships self_qos.py, a stdlib-only checker that prints five PASS lines. The README step 3 tells you to run it "to confirm the files and math are intact." I wanted to know what "intact" covers, so I mutated copies of the kit seven ways and ran the shipped script against each.
| Mutation | Caught? |
|---|---|
| One-cent change to a worked-quote total (Q-001 65.00 → 65.01) |
caught — rc 1, names the quote |
Delete 10_Client_Acquisition_Playbook.md
|
caught — rc 1, names the file |
02_Lot_Size_Tiers.csv: LOT-S per-push 85.00 → 99.00 |
not caught — five PASS lines |
02_Lot_Size_Tiers.csv: DRIVE-2C on-site 22 → 45 min |
not caught |
11_Rebooking_and_Route_Playbook.md: revenue/hour 180.21 → 999.99 |
not caught |
14_Seasonal_Cashflow_Planner.md: set-aside 1,023.00 → 9,999.00 |
not caught |
06_Contract_Templates_Pack.md: trigger-depth clause weakened |
not caught |
Two out of seven. The reason is in the source: the verifier parses three CSVs (01, 04, 05) and zero Markdown files. It never opens 02_Lot_Size_Tiers.csv — the table that defines every tier price and every time standard — and it never reads a single word of the eleven documents that make up 13,737 of the kit's words.
That is worth stating plainly, because the PASS line reads "manifest 17/17 files" — which a reader will parse as "all seventeen files are checked." What it actually means is that seventeen files exist. Existence and validity are different claims.
The quickstart ends in a FAIL
There is a second-order consequence, and it is the one I would want fixed first if I owned this kit.
The README's quickstart is:
- Read
03_Quote_Template.md. - Edit the Values in
01_Rate_Card.csvfor your market. - Run
python3 self_qos.pyfrom the kit folder to confirm the files and math are intact.
I followed steps 2 and 3 exactly: changed the two-car driveway per-push from $50.00 to $60.00, ran the verifier. Result:
SELF-QOS FAIL - Q-001 Total USD is 65.00, recomputed 75.00
Exit code 1. A brand-new buyer who follows the printed instructions in order — the single most common path through any product — gets a FAIL on step 3 of 6.
File 03 does explain this, in a paragraph buried in its Pricing notes section: "if you change a price on purpose, expect the quote check to report a difference — that is the script telling you your edit changed the math, which is the point." So the behaviour is intentional and documented. The problem is placement: the explanation lives in file 03's notes, while the instruction to run the checker lives in README step 3 with no cross-reference, and README step 3 says the check will "confirm the files and math are intact." It will not. It will fail, on the first edit, every time, for every buyer, until they find the paragraph.
Either the quickstart should say "run the verifier before you edit, to establish a baseline," or the verifier should treat a changed rate card as an expected state with a distinct message. Right now the kit's own acceptance path produces a red FAIL line as step 3 of 6.
Ice melt is priced and unreachable
01_Rate_Card.csv prices ice melt at $24.00 per 40-lb pail as a pass-through. The nine-line formula has exactly one material term, salt = round2(salt_bags * 7.50). 04_Worked_Quotes.csv has a Salt Bags column and no ice-melt column. The formula block is character-identical in 03, README and 13 — all three carry only the salt term.
So a buyer on a concrete-sensitive site, which the kit's own startup row calls out ("Concrete-sensitive sites — store dry"), cannot put an ice-melt pail on a quote using the kit's quote engine. The price exists; the pathway does not.
The stock costs and the pass-through prices disagree at the top of the band
Two startup rows buy the material that two rate-card rows sell.
Rock salt. "Pallet of 40 bags" at $300 → $900 is $7.50 → $22.50 per bag. The rate card bills $7.50 per bag, note: "Billed to clients at cost - never marked up." At the low end of the band, pass-through recovers exactly what you paid. At the high end, forty bags cost $900 and bill $300 — $600 unrecovered, on a line the contracts describe as at-cost.
Ice melt. Ten pails at $200 → $500 is $20.00 → $50.00 per pail. The card bills $24.00. At the top of the band that is $260 unrecovered across the initial stock.
The arithmetic is only exact at one end of a band the kit itself prints. If you buy at the top, "at cost" is not what the invoice produces — and unlike the salt, the ice-melt buyer has no formula term to bill against anyway.
"The trigger depth printed in every contract" is printed in two of three
The storm SOP opens with a line I like: "Clear when snow reaches 2 inches — the trigger depth printed in every contract." Later: "Every contract in 06_Contract_Templates_Pack.md carries the same trigger depth: 2 inches."
The pack holds three agreements. The Per-Push agreement states 2 inches. The Seasonal contract states 2 inches. The Sidewalk Clearing Agreement does not mention a trigger depth at all — its 308 words cover sections, rate, visit window, municipal deadlines, ice and salt, pedestrians and liability, and never say when the contractor comes out.
For sidewalks that may be the right editorial choice — sidewalk work is often window-driven rather than depth-driven. But the SOP's sentence is unqualified, and a buyer reading the SOP will believe the pack is uniform when it is not. One qualifier in the SOP fixes it.
And one clause a buyer should read before signing
The Per-Push agreement's trigger clause ends with:
"Contractor may choose to visit at a different depth when conditions call for it, and a visit at a lower depth is billed at the per-push rate."
Then file 12, the sales scripts, tells you to promise the opposite on the phone:
"You pay only for visits that happen at the trigger depth, so a no-snow week costs you nothing."
A contractor who visits at 1.5 inches, bills for it, and then has the customer produce the script — or simply remembers the sentence — is in an argument the paperwork does not win cleanly. It is a one-line fix (either the clause or the script), and it is exactly the kind of thing that only shows up when two files in the same bundle are read against each other.
Who this kit is NOT for
I would rather be specific than polite, because $1 is cheap but a wrong fit still costs you a season.
Not for you if you want a pricing answer without doing measurement. The kit's core instruction is that the tier follows measured area at a walk-through. If you want a rate you can quote from a photo or a phone call, this bundle will frustrate you — that is deliberately the one thing it refuses to give.
Not for you if you already run a snow business with contracts and a route. The tier prices ($35–$275 per push) are example figures, the contracts are templates you would need to have reviewed, and the route grid has the timing problem above. A working operator already knows more than file 02.
Not for you if you want software. There is no app, no calculator spreadsheet, no CRM, no map integration, no invoicing connection. It is Markdown and four CSVs and one Python script. If you were expecting a tool that computes the quote for you, this is a document set that tells you how to compute it yourself.
Not for you if you need a legal or insurance answer. File 09 is a list of questions to ask your city and your agent. It deliberately refuses to tell you what the answers are, because they change by county. If you wanted the answers, this is the wrong product; if you wanted better questions, it is a good one.
Not for you if you cannot use a text editor. Plain files are the selling point and the barrier.
What I would change, in order
- Reconcile Table RD with file 02. Either the route example or the time standards is wrong. Publish the recomputed $148.29 alongside the printed $180.21, or fix the standards.
- Move the "your edit will FAIL the verifier" explanation into README step 3, or make the verifier distinguish "broken" from "edited on purpose."
-
Add an ice-melt term to the nine-line formula and a column to the quote CSV, or drop
ICE-PAILfrom the rate card. - Make the salt and ice-melt bands reconcile with the pass-through prices, or relabel them "at cost, within the band you actually paid."
- Qualify the SOP's "every contract" sentence, or add a trigger line to the sidewalk agreement.
- Reconcile the below-trigger billing clause with the sales script's promise.
-
Extend
self_qos.pyto parse02_Lot_Size_Tiers.csv— one file, and it is the one that defines every tier price and time standard.
None of those is a rewrite. Five are one-line edits. That is what makes the finding worth publishing rather than a reason to walk away: the hard part of this kit is done and done well — the nine-line engine is correct to the cent across 132 cells, and the contract pack is a real document set — and what remains is cross-file reconciliation, which is exactly the kind of defect that only appears when somebody reads the whole bundle against itself.
The honesty block
I am reproducing this unsoftened because it is the part that most marketing copy would trim:
Example figures in this kit are illustrative planning inputs — not market rates and not earnings. The six worked quotes are arithmetic demonstrations at stated inputs. They are not forecasts, not income claims, and not evidence that anyone has earned anything from snow removal. No legal, tax, insurance, licensing, or financial advice is given or implied; the licensing primer is explicitly a list of questions for your own city, county and agent. No CRM, mapping, API or invoicing integration is claimed — the bundle ships plain files and one stdlib Python script. All client names in the worked quotes are fictional. No ratings, reviews, testimonials, customer counts or sales figures appear in this article, and none appear on the listing.
Where to find it: Snow Removal Business Starter Kit — Pricing Calculator & Operations Docs, $1.00 at the time of writing. The licence is personal use, no resale — it is not MIT, not open source, and not resellable.
If the arithmetic above is what you needed, $1 is cheap. If you needed one of the five things in the "NOT for" section, keep your dollar.
Top comments (0)