Want More Productive Developers? Give Them Less Work.

Sometimes, improving developer productivity has less to do with how we perform the work and more to do with questioning why we perform it.

A development team can improve its velocity, close more tickets, automate its reporting, and introduce better project management tools while making the actual work increasingly difficult.

If you work in software development, you probably know the routine. You file tickets, update the board, push commits, review pull requests, answer messages, and attend meetings.

By the end of the day, there is plenty of activity to show for your time.

The sprint board has moved. Tickets have changed status. The activity logs are full.

But is the project actually moving forward?

I've been thinking about the distinction between doing work and making progress. The two often overlap, but they are not necessarily the same thing.

What makes this distinction interesting is that, in our attempts to improve productivity, we sometimes introduce additional work without questioning whether that work contributes to the result.


Activity is easy to measure. Productivity is harder.

We have tools for practically everything.

Project management systems track tickets. Git platforms record commits and pull requests. Communication platforms help us monitor interactions. Dashboards summarize activity and turn it into charts.

These measurements are useful. They help us understand workload, coordinate teams, and identify potential bottlenecks.

The problem comes when we start treating them as direct evidence of productivity.

A developer who closes twenty small tickets may appear more productive than someone who spends a day investigating a difficult architectural problem.

But what if that investigation prevents weeks of rework? What if the twenty tickets address recurring symptoms while the architectural investigation identifies their underlying cause?

Counting completed tickets doesn't tell us the difference.

The same applies to commits, lines of code, meetings, and hours worked. They describe different aspects of the work, but they don't independently establish its value.

Being busy tells us that we're using time, not necessarily that we're using it well.

What are we actually producing?

At its simplest, productivity describes the relationship between meaningful output and the resources invested to produce it.

For knowledge work, however, the definition of output deserves some attention.

A developer's contribution isn't necessarily proportional to the number of lines written.

Sometimes, a small modification removes a major source of complexity. Sometimes, a few hours of debugging resolve a recurring production issue. Sometimes, the most useful contribution is discovering that a proposed feature isn't worth building.

The visible output may be small while the impact is substantial.

The same principle applies outside development.

A technical lead who clarifies an architectural decision might prevent several developers from implementing incompatible solutions. A manager who removes an unnecessary approval step could reduce delivery times across an entire team.

Neither contribution is adequately represented by counting completed tasks.

This doesn't mean every discussion, investigation, or management activity is productive. It means we need to examine what the activity produces.

  • What changed as a result of the work?
  • Did it solve a problem or reduce uncertainty?
  • Did it remove a constraint?
  • Did it prevent unnecessary work elsewhere?
  • Was the result worth the resources invested?

These questions help establish a relationship between the work performed and the progress achieved.

An illustration of a workspace where productivity becomes associated with filling calendars, organizing tasks, and maintaining activity.

When activity becomes an objective, even unnecessary work can appear productive.


Your productivity tools can become a source of work

We introduce a project management platform to improve coordination.

Then we create additional fields, require more status updates, build dashboards, and schedule meetings to review the information.

Eventually, maintaining the system becomes another part of the job.

Some of that overhead is justified. We need enough structure to make work understandable, coordinate dependencies, and manage uncertainty.

But introducing a tool also introduces responsibilities associated with its use. Someone needs to maintain the information, establish conventions, configure the system, and ensure that people use it consistently.

The question is whether the improvement justifies these additional responsibilities.

The fact that a tool is available doesn't mean we need to use every feature. And the fact that a process can be automated doesn't mean the process needs to exist.

Automating a report nobody reads simply makes unnecessary reporting faster.

Tracking a metric that never influences a decision adds information without necessarily improving anything.

We can spend considerable time organizing work, updating work, and reporting on work while leaving less capacity to perform the work itself.

Tools should support the work, not become the work.

Keeping everyone busy can make the system slower

There is a related problem with maximizing individual utilization.

In software development, work rarely progresses without interruption.

A pull request waits for review. A feature depends on an API change. A production issue takes priority over planned work. A technical decision blocks several other tasks.

Imagine a team where everyone has already been allocated work for the entirety of their available time.

Who reviews the unexpected pull request?

Who investigates the production issue?

Who helps resolve the technical dependency?

Each of these activities requires capacity. When that capacity isn't available, the work either waits or interrupts something else.

This is one of the consequences of operating a system with high utilization and variable demand: waiting times can increase considerably as available capacity disappears.

Keeping every individual occupied does not necessarily improve the performance of the system as a whole.

The same applies to work in progress.

Ten tasks being worked on simultaneously aren't necessarily better than three tasks moving steadily toward completion.

Additional work in progress can introduce:

  • Context switching.
  • Coordination overhead.
  • Unresolved dependencies.
  • Longer feedback loops.
  • More unfinished work to maintain.

A team needs sufficient available capacity to respond to variability, review work, resolve blockers, and absorb unexpected demands.

That capacity may appear unused when examining an individual schedule. At the system level, however, it can be what allows work to continue flowing.

The objective is not to maximize how much work is being performed at any given moment, but to improve how effectively valuable work reaches completion.


Try subtraction before optimization

When productivity feels low, the instinct is often to introduce something.

Another tool. Another dashboard. Another meeting. Another process. Another metric.

Sometimes, that is exactly what's needed.

But before introducing a new mechanism to improve the work, it is worth examining the work that already exists.

At the process level

  • Can a recurring meeting become an asynchronous update?
  • Can a report use information already available elsewhere?
  • Can an approval step be eliminated without introducing unacceptable risk?
  • Can the team stop maintaining a metric that never influences a decision?

At the task level

  • Can a feature be simplified?
  • Can an unnecessary dependency be removed?
  • Can a decision be made once instead of repeatedly reopened?
  • Can the team stop working on something that no longer justifies its cost?

Removing unnecessary work can improve several dimensions of productivity simultaneously.

Removing a handoff may reduce waiting, coordination, and the risk of misunderstanding. Simplifying an implementation may reduce both development time and future maintenance costs.

Unlike asking people to work faster, these improvements change the amount of work required to achieve the result.

Of course, removing work indiscriminately isn't the answer.

Reviews, tests, documentation, and controls may consume resources today while preventing considerably larger costs tomorrow.

An activity that doesn't produce an immediately visible result isn't necessarily unnecessary.

The point is to understand what purpose the activity serves, what it consumes, and what would happen if it were removed.

Before optimizing how something is done, establish whether it needs to be done at all.


Make progress the objective

None of this means we should stop tracking tickets, measuring delivery, or using productivity tools.

We need operational measurements to understand how a system behaves. We simply need to be careful about the conclusions we draw from them.

A busy board tells us that many tasks are being handled. It doesn't tell us whether those tasks are necessary, whether they are producing useful outcomes, or whether the same results could be achieved with fewer resources.

The next time a team looks productive on paper but struggles to deliver, look beyond individual activity.

Examine unfinished work, dependencies, repeated coordination, and the processes that consume resources without meaningfully changing the result.

The improvement might not come from asking developers to complete more tickets.

It might come from removing a bottleneck, simplifying a decision, or stopping work that shouldn't have been started.

This is the central idea behind the MXI Studio editorial Busy Is Not Productive.

Productivity is not the amount of activity a system can generate. It is the meaningful progress that system produces relative to the time, effort, and resources it consumes.

Perhaps, before asking how we could do more, we should start with a different question:

What could we stop doing and still achieve a better result?