Our Pickers Swap Out of Stock Products for Equivalents and on Tall Residential Buildings That Is No Longer Their Call

For as long as I have worked in this trade, a merchant that runs out of a product sends the nearest equivalent. If a picker cannot find the brand of fire rated board on the order, he sends another brand of the same rating, and the delivery note says substituted. Most builders are glad of it.

The Building Safety Act 2022 is turning that habit into a problem for some of our customers. In England, a higher risk building is one at least eighteen metres or seven storeys tall with at least two homes in it. Since October 2023, building one has needed approval from the Building Safety Regulator before work starts, and the approved plans are expected to say which products are being used. Changes during construction have to be recorded, and some must be approved before they are made. The people responsible must also keep a golden thread of information, held digitally, so that what was built can be known accurately for the life of the building.

Two of our largest customers now build blocks of flats that fall under these rules. Last spring one of them rejected a delivery of cavity barriers because they were a different brand from the one specified. Our substitute was a good product, but the contractor could not install it without recording and assessing the change, and nobody on site had been told before it arrived.

Our order system was never built for this. Substitution happens at picking, on a handheld scanner, and the only record is a line on the delivery note. It does not know which orders are for higher risk buildings, and it has nowhere to put the product data and declarations of performance a contractor needs for its records.

We are now changing it. Orders for higher risk buildings carry a flag from the account, and on those orders a picker cannot substitute without the customer's written approval first. Every line we deliver to those sites will carry links to the product's technical data, and the delivery records we keep are being designed to be handed over, not just filed.

I expect this to spread. When the law asks the people who own a building to know exactly what is in it, every supplier in the chain becomes part of that record. Our job will increasingly be keeping the evidence of what we sent, not only sending it.

– Serguey Shinder